9] fitting
Tools: – Iron rod, rope, eagle tape, randha, hammer, line rope,
Spirit Level, Level Tub, Thapi
Purpose: – Learning to construct by laying the foundation.
There are three methods to build houses, columns, foundations, foundations.
We had to prepare the cloth for the plant. For this we have used this method of foundation and foundation.
Action: – Bring all the material equipment to workplace. 2] The first point
Fix it Right angle and tape measure with second pitch
Took it Two or two rods are applied outside the point. And the order is constructed by the measurement of the fourth layer and
The foundation was marked by the foundation. The fourth and the feet of the construction
Use different marking marks. Each angle
It should be 90 °. For this, we measure the distance of 8ft by the width
Take the foundations dig. In construction we prepare goods as 6: 1
Was done.
Inspection: – All the bees who have 90 ° C while doing the foot.
Conclusion: – Placing the foot before the house construction. Needed
Learn how it is.