AIM:  On grid and off grid Solar Power Plant

Requirements:  Panel System Solar charging battery grid inverter

 solar system installation

  1.  Solar panel  system should be installed at 45 degree angle  from the ground
  2.   charge controller Duo should have a proper body earthing
  3.  and on the top there should be a complete   Body  earring

On grid syteme

  1. The inverter should have Earthing
  2.  wire from the power should go to the charge controller and then the inverter

 Off grid systeme

  1. The wires from the charge controller should go to the batteries  of appropriate rating 

ON GRID AND OFF GRID SOLAR POWER PLANT