STUDANT NAME : RUTIK R. TEMKAR

SACHIN G. BHORE.

FORECAST SHEET :

MATERIAL QUANTITYRATE ( RS.)PRICE (RS.)
D PIPE50 FEET37.5 /FEET1875
C CHANEL85 FEET75 /FEET6375
SQAURE TUBE 2*270 FEET45/FEET3150
SQAURE TUBE 1*190 FEET17.5/FEET1575
ANGLE 25*25*3175FEET OR 62.57KG70/KG4379.9
MS SHEET3*3.3FEET109.37 Sq.FEET1082.76
MS FLATE 18*3140 FEET OR 42.67 M OR 18.13KG70/KG1269.1
MS FLATE 35*42 FEET OR 0.60 M OR 0.66KG70/KG46.2
MS NAILS250 GRAM100/KG25
REDOXIDE2 LITRE200/LITRE400
PAINT2 LITRE280/LITRE560
GRANDING WHEEL23570
CUTTTING WHEEL23060
POWER CUTTER WHEEL1150150
WELDING ROD 1 BOX350350
CEMENT20KG7140
SAND25KG2.3759.25
STONE15KG1.6624.9
THINER1 LITRE260260
ROLLER BRUSH32575
BRUSH16060
TOTAL21987.11

LABOUR COST = 20%

=21987.11 × 20 ÷ 100

=4397.42

ATTRITION = 10%

= 21987.11× 10 ÷ 100

= 2198.71

TOTAL COST =21987.11+ 4397.42 + 2198.71

= 28583.24

ACTION :

1.First of all inspected the place.

2.PREPARED THE DRAWING.

3.THE LADDER IS MADE ACCORDING TO THE DRAWING.

4.GIVING REDOXIDE TO THE LADDER.

5.PAINTING THE LADDER.

6.FINALLY LADDER IS READY FOR USE.

FINAL COST :

MATERIALQAUNTITYRATE (RS.)PRICE(RS.)
D PIPE48 FEET37.51800
C CHANEL83 FEET756225
Sq.TUBE 2*268 FEET453060
Sq.TUBE 1*189 FEET17.51557.5
ANGLE 25*25*3174FEET OR 62.57 KG70/kg4379.9
MS SHEET 3*3.3 FEET109.37/Sq.Ft1082.76
MS FLATE 18*3137 FEET OR 17.74KG70/KG1241.8
MS FLATE 35*42FEET OR 0.60 M OR 0.66KG70/KG46.2
NAILS 250 GRAM100/KG25
REDOXIDE1.8 LITRE200360
GRANDING WHEEL23570
CUTTING WHEEL23060
POWER CUTTER WHEEL1150150
WELDING ROD BOX1350350
CEMENT15 KG7105
SAND 20KG2.3747.4
STONE15KG1.6624.9
THINER500ML260130
PAINT ROLLER32575
BRUSH16060
PAINT ( BRAWON + PINK)1.3 LITRE350455
TOTAL21305.46

LABOUR COST = 20 %

= 21305.46 ×20÷ 100

=Rs. 4261.09

ATTRITION = 10%

= 21305.46 × 10 ÷ 100

=Rs. 2130.54

TOTAL COST = 21305.46 + 4261.09 + 2130.54

= Rs.27697.09